Saturday, December 4, 2010

Working drawings

Even if little happened on the building site up in Limpopo, we used the time to further develop a series of elements and details:






We elaborated the sections and ceiling details of all rooms as E-Lite has agreed to sponsor these.




Thanks to the help of Doka we have received all the shutterboard panels needed to do our so called DOKA-frames around the Sliding doors (donated by Primador) but as the maximum length was 250 cm we had to change some of the details and re-elaborated all the relevant plans.






We did the electrical layout for which we are still looking for sponsors.